H-Pile Splices Need a quotation or information on pile points? Click here to contact a manufacturer! Click here to order!
|
When timber piles have been spliced prior to driving, they are generally bolted on with the use of timbers or steel plate. Bolt holes should be drilled at least 1/16 in. less than bolt diameter and through the entire assembly so they will fit tightly. If the splice will be above permanent ground water special provision must be made for wood preservation. This type of splice is seldom used. A more common splice for timber is a pipe with interior wedges, installed after a length of timber is driven. The pile head is shaped to the pipe splice size and an additional length added. Again, provision must be made for preservation of the wood if the cut ends are above permanent ground water level. Timber piles require care in splicing, partly because of difference in size between the butt of the driven section and the tip of the added section. Bolted timber lagging requires accurate shaping of both sections of pile and tight attachment. Splicing timber piles should be avoided if practical. Splicing can be done but is expensive and time consuming. A better solution to extension might be a composite pile. |
| Pile Points by Pile Buck is a wholly owned subsidiary of Pile Buck® International, Inc., international publishers of Pile Buck® Newspaper as well as hundreds of pile driving, foundation, marine construction, and related publications, software and CD-ROMs. | |
|
Subscribe to Pile Buck
©Copyright 2001-2008 Pile Buck® International, Inc. Phone (772) 492-1056 |
|
|
This site maintained by Positive Infinity |
|